Sign In Sign Up
NL
Share on WhatsApp
Share on Facebook
Share on X
Share on LinkedIn

New Line Insulation This link will open in a new window is hiring
Insulation Installer with LMIA

$37 - $38/hour

  • On site

  • Ontario

Job details:

LMIA Status:
Pending LMIA

New Line Insulation This link will open in a new window has applied for a Labour Market Impact Assessment (LMIA) and will be ready to extend an offer to a foreign worker once the application is approved.

Languages

  • English

Education

  • No degree, certificate or diploma

Experience

  • 1 year to less than 2 years

On site

  • Work must be completed at the physical location. There is no option to work remotely.

Work site environment

  • Noisy
  • Dusty

Work setting

  • Construction
  • Commercial
  • Installation
  • Residential

Tasks

  • Read blueprints, drawings and specifications to determine work requirements
  • Select type of insulation required
  • Measure and cut insulating materials to required shape and dimensions using hand and power tools
  • Apply and secure insulation using spraying, blowing, pasting, strapping, taping and other application and installation methods
  • Fit insulation around obstructions and between joists and studs
  • Install vapour barriers and fire-retardant materials
  • Brush waterproofing cement or other material over insulating materials
  • Fabricate and apply removable insulation pads and covers
  • Assemble, erect and dismantle scaffolding, rigging and hoisting equipment
  • Remove asbestos, ceramic fibres, lead and mould and urea-formaldehyde insulation materials from buildings

Who can apply for this job?

The employer accepts applications from:

  • Canadian citizens and permanent or temporary residents of Canada
  • other candidates, with or without a valid Canadian work permit

Insulation Installer

Stayner - Ontario
Workplace

On site

Location

Stayner, Ontario

Job type

Permanent full time employment

Vacancies

2

Pay

$37 - $38/hour | 35 to 40 hours per week

Published on

30 Jul 2026

Applications ends

18 Oct 2026

7 days left
NL

New Line Insulation This link will open in a new window